±2 acres of unimproved land at the corner of El Privilegio Rd & Drumond Dr in Adelanto; APN: 0460-453-15. Zoned Rural Living (RL-5) this lot is suitable for building a future dream home as part of the larger housing tract, right off Highway 395. This growing area is in demand for additional housing, being spurred by the development of the Baldy Mesa Solar + Storage Project, a 1,000-acre 150 MW solar energy generation system enabled by Amazon for powering their recently built 1.2 million square foot facility. The high desert continues to grow with more than 20 million square feet of industrial product in the design or construction phase.
No schools were found in the area
Total population of , which has changed by % since 1990.
The median age of the population is , while the median
age of dwellings is .
Out of households, are families.
Hispanic/Non-Hispanic Population